1. Маҳсулот ба охир расидview
The GEYA GRT6-B2 is an electronic delay off time relay designed for industrial and domestic applications. It features adjustable delay settings and is suitable for DIN rail mounting. This manual provides essential information for safe installation, operation, and maintenance.
Хусусиятҳои асосӣ:
- Adjustable Delay: Delay can be set directly via panel knobs for convenience and intuitive control.
- Усулҳои функсионалӣ: Supports two primary functions: Delay ON (A) and Delay OFF (B). The GRT6-B2 model features 2SPDT (2NO2NC) contacts.
- Вақти васеъ: Time scale from 0.1 seconds to 10 days, divided into 10 selectable ranges.
- Нишондиҳандаи ҳолати: Equipped with LED indicators for power (green light) and working status (red light).
- Тарҳрезии компакт: Ultra-small size, only 18mm width, designed for 35mm DIN rail mounting.

2. Маълумот оид ба бехатарӣ
Please read this manual carefully before installation and operation. Failure to follow these instructions may result in equipment damage, injury, or death. This device should only be installed and serviced by qualified personnel.
- Пеш аз насб кардан, васл кардан ё нигоҳдорӣ дар дастгоҳ ҳамеша барқро ҷудо кунед.
- Боварӣ ҳосил кунед, ки ҳамаи ноқилҳо ба кодексҳои барқии маҳаллӣ ва миллӣ мувофиқат мекунанд.
- Do not operate the device if it is damaged or malfunctioning.
- Дастгоҳро аз намӣ, чанг ва ҳарорати аз ҳад зиёд муҳофизат кунед.
- Тасдиқи ҷилди дурустtage and current ratings before connecting to a power source.
3. Product Dimensions and Components
The GRT6-B2 relay is designed for compact installation on a DIN rail. Understanding its dimensions and component layout is crucial for proper integration into your system.


4. Монтаж ва кабелӣ
The GEYA GRT6-B2 relay is designed for easy installation on a 35mm DIN rail. Follow these steps for secure mounting and correct electrical connections.
4.1 Васлкунии роҳи оҳани DIN
The relay snaps onto a standard 35mm DIN rail. Ensure it is securely fastened to prevent movement during operation.
4.2 Ноқилҳои барқ
Refer to the wiring diagrams below for proper connection of the power supply and load. Always ensure power is disconnected before wiring.

4.3 Power Connection Demonstration
Watch this video for a visual guide on connecting power and load to the GRT6-B1 model, which shares similar wiring principles with the GRT6-B2.
5. Дастурҳои истифодабарӣ
The GRT6-B2 relay offers adjustable delay functions. Follow these steps to configure and operate your device.
5.1 Function Modes
The GRT6-B2 supports two main function modes:
- A: Delay ON: The output contacts close after a set delay time once power is applied.
- B: Delay OFF: The output contacts open after a set delay time once the trigger signal is removed or power is disconnected.

5.2 Танзими вақт
The delay time is set using two rotary knobs on the front panel: one for time range and one for percentage.

5.3 Нишондиҳандаҳои LED
- LED сабз: Ҳолати таъминоти барқро нишон медиҳад.
- LED сурх: Indicates the working status of the relay (e.g., timing in progress, output active).
6. Нигоҳдорӣ
The GEYA GRT6-B2 time relay is designed for reliable operation with minimal maintenance. However, periodic checks can help ensure its longevity and proper function.
- Тозакунӣ: Дастгоҳро тоза ва аз чангу хошок тоза нигоҳ доред. Барои тоза кардан матои хушк ва мулоимро истифода баред. Моеъҳои тозакунандаро истифода набаред.
- Санҷиш: Periodically inspect wiring connections to ensure they are secure and free from corrosion. Check for any signs of physical damage or overheating.
- Муҳити зист: Боварӣ ҳосил кунед, ки муҳити корӣ дар ҳудуди муқарраршудаи ҳарорат ва намӣ боқӣ мемонад, то аз шикасти бармаҳал пешгирӣ кунад.
7. Баррасии мушкилот
If the GEYA GRT6-B2 relay is not functioning as expected, consider the following common issues:
- No Power Indication (Green LED Off): Check the power supply connections (A1, A2) and ensure the voltage is within the specified range (AC/DC 24V-240V).
- Relay Not Activating/Deactivating:
- Verify the function mode (A or B) is correctly selected.
- Check the time range and percentage танзимот.
- Ensure the trigger signal (S) is correctly applied for Delay OFF functions.
- Inspect load connections and ensure the load is functioning correctly.
- Вақти нодуруст: Re-check the time range and percentage settings. Ensure the knobs are firmly set to the desired values.
- Аз ҳад зиёд гармшавӣ: If the device feels excessively hot, check the load current to ensure it does not exceed the relay's maximum rating (10A/AC1).
If problems persist after checking these points, contact a qualified electrician or the manufacturer for assistance.
8. Мушаххасоти
Detailed technical specifications for the GEYA GRT6-B2 time relay.

| Параметр | Арзиш |
|---|---|
| Бренд | ГЕЯ |
| Модели | GRT6-B2 |
| Функсия | Delay ON (A), Delay OFF (B) |
| Терминалҳои таъминот | А1-А2 |
| Ҷилдиtage Диапазон | AC/DC 24V-240V (50-60Hz) |
| Вуруди нерӯ | AC max. 6VA/1.9W |
| Диапазони вақт | 0.1s - 10 days (ON, OFF) |
| Танзими вақт | Потенциометр |
| Натиҷа | 2xSPDT (2NO2NC) |
| Рейтинги ҷорӣ | 10A/AC1 |
| Гузариш ҷилдиtage | 250VAC/24VDC |
| Ҳарорати корӣ | -20°C то +55°C (-4°F то 131°F) |
| Ҳарорати нигоҳдорӣ | -35°C то +75°C (-22°F то 158°F) |
| Монтаж | DIN rail EN/IEC 60715 |
| Андозаҳо (L x W x H) | 64мм x 18мм x 95мм (тақрибан) |
| Вазн | тахминан. 2.08 унс |
9. Кафолат ва дастгирӣ
For warranty information, please refer to the documentation provided with your purchase or contact your seller. If you require technical support or have questions regarding the GEYA GRT6-B2 time relay, please reach out to the manufacturer or authorized distributor.





